Other news

due-to-the-switch-from-a-heavily-corroded-and-dama

Due to the switch from a heavily corroded and damaged pipeline to a new gas pipeline, gas supply to up to 4,000 customers in Chugureti and Nadzaladevi districts will be temporarily suspended.

  • 22 December 2020
  • The old, damaged and dangerous gas pipeline on the territory of the fruit farm was replaced by a new, modern 500 mm gas pipeline.
  • We would like to inform you that due to the switching works of the subscribers on this new gas pipeline, gas supply in Chugureti-Nadzaladevi district will be temporarily suspended from 9:00 am on December 24 in the territory of the fruit farm - Sea settlement # 204, 205, 225, 226 (Davit Ioseliani I lane 4, II turn. 24, II turn 25) buildings, near the Tbilisi Sea (near the cadet buildings) - Unknown Heroes Street. IDPs settled in 140 and 150 (former hotel "Kartli" building), Sanergi settlement building. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, Lotkin Settlement of Cadet blocks near the Tbilisi Sea - Aviachimia, Darkveti, Sviri, Zekar, Assureti, Geguti, Akhtala, Todria, Laituri, Lamiskani, Mirzaani, Khertvisi, Gordi, Tseronisi, Samghereti, Filia, Kldekari, boarding school, Nakalakevi, Orbeti, Suvoravek, Zuvorakhev Jorjadze, Jumber Betashvili, Minadora Orjonikidze-Toroshelidze, Gabunia, Barakoni, Ushbi, Alaverdi, Nikoloz Agiashvili, Gareji, Tamar and Akaki Papavebi, Meri Shervashidze, Mariam Ivanishvili-Demuria, Mariam Dadiani-Anchardzia, Karimadzhania Taras Kvaratskhelia, Nino Tsereteli, Elo Andronikashvili, Akhalmotsameta and private sector residents of the private sector, as well as gas supply will be cut off near the Tbilisi Sea - Gino Park Ltd, Zink.com Com, SOCAR gas station, Ltd. , Gamma + "," Rekha "Ltd, reef base," Gudauri Sky Resort ", in the plant farm-" Gardenia "Ltd, restaurant" Sea Paradise "(f / p) Levan Modebadze), Senator Panz Ltd Sophio Tutberidze, F / P Zaza Mukhigulashvili (bakery), Christian-Baptist baptized in the faith of the Gospel. Tbilisi Christ the Savior Church, I / M Davit Tigishvili, Chicha Papa Nobati Ltd, Kia Keramika Ltd, Turbaza Tbilisi, Davit Garejeli Church, Kindergarten # 49 Ltd BPM Global and other subscribers"Tbilisi Energy" apologizes to the subscribers for the created discomfort. These works are necessary for safe gas supply to customers.

It should be noted that network switching works in a shorter time are prevented by chaotic constructions. Most of the private houses are built on top of the average pressure gas pipelines in violation of the rules, which significantly hinders the work process.

Restoration of gas supply will start at 11.00 am on December 25 and will end at 20.00 pm.